Make lots of tests run in parallel

Putting t.Parallel() in each test makes them run in parallel.
Additional t.Parallel() could be added to each subtest, although
that requires making a local copy of the loop variable for
table driven tests.

Test: m checkbuild
Change-Id: I5d9869ead441093f4d7c5757f2447385333a95a4
This commit is contained in:
Colin Cross
2020-09-18 14:25:31 -07:00
parent 56a8321c21
commit 323dc60712
117 changed files with 661 additions and 0 deletions

View File

@@ -64,6 +64,7 @@ func ExampleDepSet_ToSortedList() {
// Tests based on Bazel's ExpanderTestBase.java to ensure compatibility
// https://github.com/bazelbuild/bazel/blob/master/src/test/java/com/google/devtools/build/lib/collect/nestedset/ExpanderTestBase.java
func TestDepSet(t *testing.T) {
t.Parallel()
a := PathForTesting("a")
b := PathForTesting("b")
c := PathForTesting("c")
@@ -274,6 +275,7 @@ func TestDepSet(t *testing.T) {
}
func TestDepSetInvalidOrder(t *testing.T) {
t.Parallel()
orders := []DepSetOrder{POSTORDER, PREORDER, TOPOLOGICAL}
run := func(t *testing.T, order1, order2 DepSetOrder) {