5 Commits

Author SHA1 Message Date
Jeongik Cha
767ce714bb Add time unit for CriticalPathInfo's fields' name
Bug: 271526845
Test: check metrics
Change-Id: Ie7e133033371906b29caad16d0b6bcd238b9f8db
2023-03-16 18:29:55 +09:00
Jeongik Cha
4199d4796c Add long running jobs info
For the data to prioritize long running tasks in ninja, I added the
information about that.

Bug: 271526845
Test: build and check metrics
Change-Id: I76807f9b0d6a50d940b5f35dd6a9ef3cf693eec5
2023-03-15 12:46:58 +09:00
Jeongik Cha
28c1fe5bc8 Add critical path infomation into metrics
To improve build efficiency, the metrics for critical path and
parallelism ratio is necessary. That information has been included in
soong.log, so added it into metrics as well.

Bug: 271526845
Test: build and check if metrics pb has critical path info
Change-Id: I14e1a78c13d400b792d3b05df18604da48759ade
2023-03-14 17:59:22 +09:00
Colin Cross
68534a29d6 Don't print critical path parallelism ratio if elapsed time is 0.
Test: m nothing, examine out/soong.log
Change-Id: Ib23902c703d306337b2a5150d6d63b1e3d0f95b3
2020-01-04 07:26:28 +00:00
Colin Cross
7b6245388c Compute critical path when ninja finishes
Keep a running map of the critical path to each edge as it
finishes.  At the end of the build, find the edge with the
longest critical path and print the path to out/soong.log.

Test: critical_path_test.go
Change-Id: Ie01d26b068b768156b166bff00cdc3273e8124ca
2019-06-26 11:31:17 -07:00