Commit Graph

2 Commits

Author SHA1 Message Date
Colin Cross
68534a29d6 Don't print critical path parallelism ratio if elapsed time is 0.
Test: m nothing, examine out/soong.log
Change-Id: Ib23902c703d306337b2a5150d6d63b1e3d0f95b3
2020-01-04 07:26:28 +00:00
Colin Cross
7b6245388c Compute critical path when ninja finishes
Keep a running map of the critical path to each edge as it
finishes.  At the end of the build, find the edge with the
longest critical path and print the path to out/soong.log.

Test: critical_path_test.go
Change-Id: Ie01d26b068b768156b166bff00cdc3273e8124ca
2019-06-26 11:31:17 -07:00