Files
build_soong/ui/status/critical_path_test.go
Colin Cross 323dc60712 Make lots of tests run in parallel
Putting t.Parallel() in each test makes them run in parallel.
Additional t.Parallel() could be added to each subtest, although
that requires making a local copy of the loop variable for
table driven tests.

Test: m checkbuild
Change-Id: I5d9869ead441093f4d7c5757f2447385333a95a4
2020-10-06 15:12:22 -07:00

168 lines
3.9 KiB
Go

// Copyright 2019 Google Inc. All rights reserved.
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
package status
import (
"reflect"
"testing"
"time"
)
type testCriticalPath struct {
*criticalPath
Counts
actions map[int]*Action
}
type testClock time.Time
func (t testClock) Now() time.Time { return time.Time(t) }
func (t *testCriticalPath) start(id int, startTime time.Duration, outputs, inputs []string) {
t.clock = testClock(time.Unix(0, 0).Add(startTime))
action := &Action{
Description: outputs[0],
Outputs: outputs,
Inputs: inputs,
}
t.actions[id] = action
t.StartAction(action, t.Counts)
}
func (t *testCriticalPath) finish(id int, endTime time.Duration) {
t.clock = testClock(time.Unix(0, 0).Add(endTime))
t.FinishAction(ActionResult{
Action: t.actions[id],
}, t.Counts)
}
func TestCriticalPath(t *testing.T) {
t.Parallel()
tests := []struct {
name string
msgs func(*testCriticalPath)
want []string
wantTime time.Duration
}{
{
name: "empty",
msgs: func(cp *testCriticalPath) {},
},
{
name: "duplicate",
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.start(1, 0, []string{"a"}, nil)
cp.finish(0, 1000)
cp.finish(0, 2000)
},
want: []string{"a"},
wantTime: 1000,
},
{
name: "linear",
// a
// |
// b
// |
// c
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.finish(0, 1000)
cp.start(1, 1000, []string{"b"}, []string{"a"})
cp.finish(1, 2000)
cp.start(2, 3000, []string{"c"}, []string{"b"})
cp.finish(2, 4000)
},
want: []string{"c", "b", "a"},
wantTime: 3000,
},
{
name: "diamond",
// a
// |\
// b c
// |/
// d
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.finish(0, 1000)
cp.start(1, 1000, []string{"b"}, []string{"a"})
cp.start(2, 1000, []string{"c"}, []string{"a"})
cp.finish(1, 2000)
cp.finish(2, 3000)
cp.start(3, 3000, []string{"d"}, []string{"b", "c"})
cp.finish(3, 4000)
},
want: []string{"d", "c", "a"},
wantTime: 4000,
},
{
name: "multiple",
// a d
// | |
// b e
// |
// c
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.start(3, 0, []string{"d"}, nil)
cp.finish(0, 1000)
cp.finish(3, 1000)
cp.start(1, 1000, []string{"b"}, []string{"a"})
cp.start(4, 1000, []string{"e"}, []string{"d"})
cp.finish(1, 2000)
cp.start(2, 2000, []string{"c"}, []string{"b"})
cp.finish(2, 3000)
cp.finish(4, 4000)
},
want: []string{"e", "d"},
wantTime: 4000,
},
}
for _, tt := range tests {
t.Run(tt.name, func(t *testing.T) {
cp := &testCriticalPath{
criticalPath: NewCriticalPath(nil).(*criticalPath),
actions: make(map[int]*Action),
}
tt.msgs(cp)
criticalPath := cp.criticalPath.criticalPath()
var descs []string
for _, x := range criticalPath {
descs = append(descs, x.action.Description)
}
if !reflect.DeepEqual(descs, tt.want) {
t.Errorf("criticalPath.criticalPath() = %v, want %v", descs, tt.want)
}
var gotTime time.Duration
if len(criticalPath) > 0 {
gotTime = criticalPath[0].cumulativeDuration
}
if gotTime != tt.wantTime {
t.Errorf("cumulativeDuration[0].cumulativeDuration = %v, want %v", gotTime, tt.wantTime)
}
})
}
}