Keep a running map of the critical path to each edge as it finishes. At the end of the build, find the edge with the longest critical path and print the path to out/soong.log. Test: critical_path_test.go Change-Id: Ie01d26b068b768156b166bff00cdc3273e8124ca
153 lines
3.9 KiB
Go
153 lines
3.9 KiB
Go
// Copyright 2019 Google Inc. All rights reserved.
|
|
//
|
|
// Licensed under the Apache License, Version 2.0 (the "License");
|
|
// you may not use this file except in compliance with the License.
|
|
// You may obtain a copy of the License at
|
|
//
|
|
// http://www.apache.org/licenses/LICENSE-2.0
|
|
//
|
|
// Unless required by applicable law or agreed to in writing, software
|
|
// distributed under the License is distributed on an "AS IS" BASIS,
|
|
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
|
// See the License for the specific language governing permissions and
|
|
// limitations under the License.
|
|
|
|
package status
|
|
|
|
import (
|
|
"time"
|
|
|
|
"android/soong/ui/logger"
|
|
)
|
|
|
|
func NewCriticalPath(log logger.Logger) StatusOutput {
|
|
return &criticalPath{
|
|
log: log,
|
|
running: make(map[*Action]time.Time),
|
|
nodes: make(map[string]*node),
|
|
clock: osClock{},
|
|
}
|
|
}
|
|
|
|
type criticalPath struct {
|
|
log logger.Logger
|
|
|
|
nodes map[string]*node
|
|
running map[*Action]time.Time
|
|
|
|
start, end time.Time
|
|
|
|
clock clock
|
|
}
|
|
|
|
type clock interface {
|
|
Now() time.Time
|
|
}
|
|
|
|
type osClock struct{}
|
|
|
|
func (osClock) Now() time.Time { return time.Now() }
|
|
|
|
// A critical path node stores the critical path (the minimum time to build the node and all of its dependencies given
|
|
// perfect parallelism) for an node.
|
|
type node struct {
|
|
action *Action
|
|
cumulativeDuration time.Duration
|
|
duration time.Duration
|
|
input *node
|
|
}
|
|
|
|
func (cp *criticalPath) StartAction(action *Action, counts Counts) {
|
|
start := cp.clock.Now()
|
|
if cp.start.IsZero() {
|
|
cp.start = start
|
|
}
|
|
cp.running[action] = start
|
|
}
|
|
|
|
func (cp *criticalPath) FinishAction(result ActionResult, counts Counts) {
|
|
if start, ok := cp.running[result.Action]; ok {
|
|
delete(cp.running, result.Action)
|
|
|
|
// Determine the input to this edge with the longest cumulative duration
|
|
var criticalPathInput *node
|
|
for _, input := range result.Action.Inputs {
|
|
if x := cp.nodes[input]; x != nil {
|
|
if criticalPathInput == nil || x.cumulativeDuration > criticalPathInput.cumulativeDuration {
|
|
criticalPathInput = x
|
|
}
|
|
}
|
|
}
|
|
|
|
end := cp.clock.Now()
|
|
duration := end.Sub(start)
|
|
|
|
cumulativeDuration := duration
|
|
if criticalPathInput != nil {
|
|
cumulativeDuration += criticalPathInput.cumulativeDuration
|
|
}
|
|
|
|
node := &node{
|
|
action: result.Action,
|
|
cumulativeDuration: cumulativeDuration,
|
|
duration: duration,
|
|
input: criticalPathInput,
|
|
}
|
|
|
|
for _, output := range result.Action.Outputs {
|
|
cp.nodes[output] = node
|
|
}
|
|
|
|
cp.end = end
|
|
}
|
|
}
|
|
|
|
func (cp *criticalPath) Flush() {
|
|
criticalPath := cp.criticalPath()
|
|
|
|
if len(criticalPath) > 0 {
|
|
// Log the critical path to the verbose log
|
|
criticalTime := criticalPath[0].cumulativeDuration.Round(time.Second)
|
|
cp.log.Verbosef("critical path took %s", criticalTime.String())
|
|
if !cp.start.IsZero() {
|
|
elapsedTime := cp.end.Sub(cp.start).Round(time.Second)
|
|
cp.log.Verbosef("elapsed time %s", elapsedTime.String())
|
|
cp.log.Verbosef("perfect parallelism ratio %d%%",
|
|
int(float64(criticalTime)/float64(elapsedTime)*100))
|
|
}
|
|
cp.log.Verbose("critical path:")
|
|
for i := len(criticalPath) - 1; i >= 0; i-- {
|
|
duration := criticalPath[i].duration
|
|
duration = duration.Round(time.Second)
|
|
seconds := int(duration.Seconds())
|
|
cp.log.Verbosef(" %2d:%02d %s",
|
|
seconds/60, seconds%60, criticalPath[i].action.Description)
|
|
}
|
|
}
|
|
}
|
|
|
|
func (cp *criticalPath) Message(level MsgLevel, msg string) {}
|
|
|
|
func (cp *criticalPath) Write(p []byte) (n int, err error) { return len(p), nil }
|
|
|
|
func (cp *criticalPath) criticalPath() []*node {
|
|
var max *node
|
|
|
|
// Find the node with the longest critical path
|
|
for _, node := range cp.nodes {
|
|
if max == nil || node.cumulativeDuration > max.cumulativeDuration {
|
|
max = node
|
|
}
|
|
}
|
|
|
|
// Follow the critical path back to the leaf node
|
|
var criticalPath []*node
|
|
node := max
|
|
for node != nil {
|
|
criticalPath = append(criticalPath, node)
|
|
node = node.input
|
|
}
|
|
|
|
return criticalPath
|
|
}
|