For the data to prioritize long running tasks in ninja, I added the information about that. Bug: 271526845 Test: build and check metrics Change-Id: I76807f9b0d6a50d940b5f35dd6a9ef3cf693eec5
158 lines
4.1 KiB
Go
158 lines
4.1 KiB
Go
// Copyright 2019 Google Inc. All rights reserved.
|
|
//
|
|
// Licensed under the Apache License, Version 2.0 (the "License");
|
|
// you may not use this file except in compliance with the License.
|
|
// You may obtain a copy of the License at
|
|
//
|
|
// http://www.apache.org/licenses/LICENSE-2.0
|
|
//
|
|
// Unless required by applicable law or agreed to in writing, software
|
|
// distributed under the License is distributed on an "AS IS" BASIS,
|
|
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
|
// See the License for the specific language governing permissions and
|
|
// limitations under the License.
|
|
|
|
package status
|
|
|
|
import (
|
|
"android/soong/ui/metrics"
|
|
|
|
soong_metrics_proto "android/soong/ui/metrics/metrics_proto"
|
|
"time"
|
|
|
|
"google.golang.org/protobuf/proto"
|
|
)
|
|
|
|
func NewCriticalPath() *CriticalPath {
|
|
return &CriticalPath{
|
|
running: make(map[*Action]time.Time),
|
|
nodes: make(map[string]*node),
|
|
clock: osClock{},
|
|
}
|
|
}
|
|
|
|
type CriticalPath struct {
|
|
nodes map[string]*node
|
|
running map[*Action]time.Time
|
|
|
|
start, end time.Time
|
|
|
|
clock clock
|
|
}
|
|
|
|
type clock interface {
|
|
Now() time.Time
|
|
}
|
|
|
|
type osClock struct{}
|
|
|
|
func (osClock) Now() time.Time { return time.Now() }
|
|
|
|
// A critical path node stores the critical path (the minimum time to build the node and all of its dependencies given
|
|
// perfect parallelism) for an node.
|
|
type node struct {
|
|
action *Action
|
|
cumulativeDuration time.Duration
|
|
duration time.Duration
|
|
input *node
|
|
}
|
|
|
|
func (cp *CriticalPath) StartAction(action *Action) {
|
|
start := cp.clock.Now()
|
|
if cp.start.IsZero() {
|
|
cp.start = start
|
|
}
|
|
cp.running[action] = start
|
|
}
|
|
|
|
func (cp *CriticalPath) FinishAction(action *Action) {
|
|
if start, ok := cp.running[action]; ok {
|
|
delete(cp.running, action)
|
|
|
|
// Determine the input to this edge with the longest cumulative duration
|
|
var criticalPathInput *node
|
|
for _, input := range action.Inputs {
|
|
if x := cp.nodes[input]; x != nil {
|
|
if criticalPathInput == nil || x.cumulativeDuration > criticalPathInput.cumulativeDuration {
|
|
criticalPathInput = x
|
|
}
|
|
}
|
|
}
|
|
|
|
end := cp.clock.Now()
|
|
duration := end.Sub(start)
|
|
|
|
cumulativeDuration := duration
|
|
if criticalPathInput != nil {
|
|
cumulativeDuration += criticalPathInput.cumulativeDuration
|
|
}
|
|
|
|
node := &node{
|
|
action: action,
|
|
cumulativeDuration: cumulativeDuration,
|
|
duration: duration,
|
|
input: criticalPathInput,
|
|
}
|
|
|
|
for _, output := range action.Outputs {
|
|
cp.nodes[output] = node
|
|
}
|
|
|
|
cp.end = end
|
|
}
|
|
}
|
|
|
|
func (cp *CriticalPath) criticalPath() (path []*node, elapsedTime time.Duration, criticalTime time.Duration) {
|
|
var max *node
|
|
|
|
// Find the node with the longest critical path
|
|
for _, node := range cp.nodes {
|
|
if max == nil || node.cumulativeDuration > max.cumulativeDuration {
|
|
max = node
|
|
}
|
|
}
|
|
|
|
node := max
|
|
for node != nil {
|
|
path = append(path, node)
|
|
node = node.input
|
|
}
|
|
if len(path) > 0 {
|
|
// Log the critical path to the verbose log
|
|
criticalTime = path[0].cumulativeDuration
|
|
if !cp.start.IsZero() {
|
|
elapsedTime = cp.end.Sub(cp.start)
|
|
}
|
|
}
|
|
return
|
|
}
|
|
|
|
func (cp *CriticalPath) longRunningJobs() (nodes []*node) {
|
|
threshold := time.Second * 30
|
|
for _, node := range cp.nodes {
|
|
if node != nil && node.duration > threshold {
|
|
nodes = append(nodes, node)
|
|
}
|
|
}
|
|
return
|
|
}
|
|
|
|
func addJobInfos(jobInfos *[]*soong_metrics_proto.JobInfo, sources []*node) {
|
|
for _, job := range sources {
|
|
jobInfo := soong_metrics_proto.JobInfo{}
|
|
jobInfo.ElapsedTime = proto.Uint64(uint64(job.duration.Microseconds()))
|
|
jobInfo.JobDescription = &job.action.Description
|
|
*jobInfos = append(*jobInfos, &jobInfo)
|
|
}
|
|
}
|
|
|
|
func (cp *CriticalPath) WriteToMetrics(met *metrics.Metrics) {
|
|
criticalPathInfo := soong_metrics_proto.CriticalPathInfo{}
|
|
path, elapsedTime, criticalTime := cp.criticalPath()
|
|
criticalPathInfo.ElapsedTime = proto.Uint64(uint64(elapsedTime.Microseconds()))
|
|
criticalPathInfo.CriticalPathTime = proto.Uint64(uint64(criticalTime.Microseconds()))
|
|
addJobInfos(&criticalPathInfo.LongRunningJobs, cp.longRunningJobs())
|
|
addJobInfos(&criticalPathInfo.CriticalPath, path)
|
|
met.SetCriticalPathInfo(criticalPathInfo)
|
|
}
|