Jeongik Cha 28c1fe5bc8 Add critical path infomation into metrics
To improve build efficiency, the metrics for critical path and
parallelism ratio is necessary. That information has been included in
soong.log, so added it into metrics as well.

Bug: 271526845
Test: build and check if metrics pb has critical path info
Change-Id: I14e1a78c13d400b792d3b05df18604da48759ade
2023-03-14 17:59:22 +09:00

74 lines
2.3 KiB
Go

// Copyright 2023 Google Inc. All rights reserved.
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
package status
import (
"time"
"android/soong/ui/logger"
)
// Create a new CriticalPathLogger. if criticalPath is nil, it creates a new criticalPath,
// if not, it uses that.(its purpose is using a critical path outside logger)
func NewCriticalPathLogger(log logger.Logger, criticalPath *CriticalPath) StatusOutput {
if criticalPath == nil {
criticalPath = NewCriticalPath()
}
return &criticalPathLogger{
log: log,
criticalPath: criticalPath,
}
}
type criticalPathLogger struct {
log logger.Logger
criticalPath *CriticalPath
}
func (cp *criticalPathLogger) StartAction(action *Action, counts Counts) {
cp.criticalPath.StartAction(action)
}
func (cp *criticalPathLogger) FinishAction(result ActionResult, counts Counts) {
cp.criticalPath.FinishAction(result.Action)
}
func (cp *criticalPathLogger) Flush() {
criticalPath, elapsedTime, criticalTime := cp.criticalPath.criticalPath()
if len(criticalPath) > 0 {
cp.log.Verbosef("critical path took %s", criticalTime.String())
if !cp.criticalPath.start.IsZero() {
cp.log.Verbosef("elapsed time %s", elapsedTime.String())
if elapsedTime > 0 {
cp.log.Verbosef("perfect parallelism ratio %d%%",
int(float64(criticalTime)/float64(elapsedTime)*100))
}
}
cp.log.Verbose("critical path:")
for i := len(criticalPath) - 1; i >= 0; i-- {
duration := criticalPath[i].duration
duration = duration.Round(time.Second)
seconds := int(duration.Seconds())
cp.log.Verbosef(" %2d:%02d %s",
seconds/60, seconds%60, criticalPath[i].action.Description)
}
}
}
func (cp *criticalPathLogger) Message(level MsgLevel, msg string) {}
func (cp *criticalPathLogger) Write(p []byte) (n int, err error) { return len(p), nil }