Make lots of tests run in parallel
Putting t.Parallel() in each test makes them run in parallel. Additional t.Parallel() could be added to each subtest, although that requires making a local copy of the loop variable for table driven tests. Test: m checkbuild Change-Id: I5d9869ead441093f4d7c5757f2447385333a95a4
This commit is contained in:
@@ -51,6 +51,7 @@ func (t *testCriticalPath) finish(id int, endTime time.Duration) {
|
||||
}
|
||||
|
||||
func TestCriticalPath(t *testing.T) {
|
||||
t.Parallel()
|
||||
tests := []struct {
|
||||
name string
|
||||
msgs func(*testCriticalPath)
|
||||
|
Reference in New Issue
Block a user