Files
build_soong/ui/status/critical_path_test.go
Jeongik Cha 28c1fe5bc8 Add critical path infomation into metrics
To improve build efficiency, the metrics for critical path and
parallelism ratio is necessary. That information has been included in
soong.log, so added it into metrics as well.

Bug: 271526845
Test: build and check if metrics pb has critical path info
Change-Id: I14e1a78c13d400b792d3b05df18604da48759ade
2023-03-14 17:59:22 +09:00

165 lines
3.8 KiB
Go

// Copyright 2019 Google Inc. All rights reserved.
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
package status
import (
"reflect"
"testing"
"time"
)
type testCriticalPath struct {
*CriticalPath
Counts
actions map[int]*Action
}
type testClock time.Time
func (t testClock) Now() time.Time { return time.Time(t) }
func (t *testCriticalPath) start(id int, startTime time.Duration, outputs, inputs []string) {
t.clock = testClock(time.Unix(0, 0).Add(startTime))
action := &Action{
Description: outputs[0],
Outputs: outputs,
Inputs: inputs,
}
t.actions[id] = action
t.StartAction(action)
}
func (t *testCriticalPath) finish(id int, endTime time.Duration) {
t.clock = testClock(time.Unix(0, 0).Add(endTime))
t.FinishAction(t.actions[id])
}
func TestCriticalPath(t *testing.T) {
tests := []struct {
name string
msgs func(*testCriticalPath)
want []string
wantTime time.Duration
}{
{
name: "empty",
msgs: func(cp *testCriticalPath) {},
},
{
name: "duplicate",
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.start(1, 0, []string{"a"}, nil)
cp.finish(0, 1000)
cp.finish(0, 2000)
},
want: []string{"a"},
wantTime: 1000,
},
{
name: "linear",
// a
// |
// b
// |
// c
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.finish(0, 1000)
cp.start(1, 1000, []string{"b"}, []string{"a"})
cp.finish(1, 2000)
cp.start(2, 3000, []string{"c"}, []string{"b"})
cp.finish(2, 4000)
},
want: []string{"c", "b", "a"},
wantTime: 3000,
},
{
name: "diamond",
// a
// |\
// b c
// |/
// d
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.finish(0, 1000)
cp.start(1, 1000, []string{"b"}, []string{"a"})
cp.start(2, 1000, []string{"c"}, []string{"a"})
cp.finish(1, 2000)
cp.finish(2, 3000)
cp.start(3, 3000, []string{"d"}, []string{"b", "c"})
cp.finish(3, 4000)
},
want: []string{"d", "c", "a"},
wantTime: 4000,
},
{
name: "multiple",
// a d
// | |
// b e
// |
// c
msgs: func(cp *testCriticalPath) {
cp.start(0, 0, []string{"a"}, nil)
cp.start(3, 0, []string{"d"}, nil)
cp.finish(0, 1000)
cp.finish(3, 1000)
cp.start(1, 1000, []string{"b"}, []string{"a"})
cp.start(4, 1000, []string{"e"}, []string{"d"})
cp.finish(1, 2000)
cp.start(2, 2000, []string{"c"}, []string{"b"})
cp.finish(2, 3000)
cp.finish(4, 4000)
},
want: []string{"e", "d"},
wantTime: 4000,
},
}
for _, tt := range tests {
t.Run(tt.name, func(t *testing.T) {
cp := &testCriticalPath{
CriticalPath: NewCriticalPath(),
actions: make(map[int]*Action),
}
tt.msgs(cp)
criticalPath, _, _ := cp.CriticalPath.criticalPath()
var descs []string
for _, x := range criticalPath {
descs = append(descs, x.action.Description)
}
if !reflect.DeepEqual(descs, tt.want) {
t.Errorf("criticalPath.criticalPath() = %v, want %v", descs, tt.want)
}
var gotTime time.Duration
if len(criticalPath) > 0 {
gotTime = criticalPath[0].cumulativeDuration
}
if gotTime != tt.wantTime {
t.Errorf("cumulativeDuration[0].cumulativeDuration = %v, want %v", gotTime, tt.wantTime)
}
})
}
}