Commit Graph

4 Commits

Author SHA1 Message Date
Jeongik Cha
28c1fe5bc8 Add critical path infomation into metrics
To improve build efficiency, the metrics for critical path and
parallelism ratio is necessary. That information has been included in
soong.log, so added it into metrics as well.

Bug: 271526845
Test: build and check if metrics pb has critical path info
Change-Id: I14e1a78c13d400b792d3b05df18604da48759ade
2023-03-14 17:59:22 +09:00
Colin Cross
405af07859 Revert "Make lots of tests run in parallel"
This reverts commit 323dc60712.

Reason for revert: Possible cause of test instability
Bug: 170513220
Test: soong tests

Change-Id: Iee168e9fbb4210569e6cffcc23e60d111403abb8
2020-10-09 18:34:24 -07:00
Colin Cross
323dc60712 Make lots of tests run in parallel
Putting t.Parallel() in each test makes them run in parallel.
Additional t.Parallel() could be added to each subtest, although
that requires making a local copy of the loop variable for
table driven tests.

Test: m checkbuild
Change-Id: I5d9869ead441093f4d7c5757f2447385333a95a4
2020-10-06 15:12:22 -07:00
Colin Cross
7b6245388c Compute critical path when ninja finishes
Keep a running map of the critical path to each edge as it
finishes.  At the end of the build, find the edge with the
longest critical path and print the path to out/soong.log.

Test: critical_path_test.go
Change-Id: Ie01d26b068b768156b166bff00cdc3273e8124ca
2019-06-26 11:31:17 -07:00